September 4th
getting the therapy garden ready for pouring a sidewalk
this required moving the gravel to the sidewalk from where the truck dumped it
we won't pour until spring, the ground is still shifting after refilling,
the last big rain revealed this fact
we won't pour until spring, the ground is still shifting after refilling,
the last big rain revealed this fact
this is about an eighth or less than what the pile looked like at the started of the day,
it was a full truck load
we were all tired by the time 15:00 rolled around, especially because of the heat
----------------------------
and the roof begins
bedrooms all along the back wall of the house on the right
the back hall to the guest room and exercise room
the back door out to the therapy garden
bedrooms on the left, utility room on the right
No comments:
Post a Comment