Tuesday, with predictions of rain in the forecast, but more cement arriving this day, the work started right after a breakfast of cornbread and beans was prepared.


The cement truck arrived & managed not to hit any of our trees and I think our grape vines even made it through round one.


It came today for the foundation of the back wall that will be built, 
beginning around the perimeter.


Bruce, overseeing the work, taking a break. 
He and his brother Ralph are nonstop working machines, if there's a job to be done, their on it.


Vladamier, from church, joined us both Monday & today.
His strength in working has been so very helpful, he's a digging machine. 
He says he's up for more of it again next week. 


The old house on the plot for Naomi's home is coming down...


...today!!!


Trying to save what we can, Sergei helped in getting the rest of the roof off.


& the storm blows in


Look out below! 
It took 12 big truck loads to clear the plot of the debris from the old house. 
The old fruit trees will come down next as they no longer bear fruit. 
May 16th
Monday was a crazy busy day, but no rain! Two thumbs up.


Clearing the fallen wall of the septic tank was first on the list.
Though a clear sunny day, I still had concerns about the guys being in the pit.
We had 5 or 6 "Indians" & 5 or 6 "Chiefs" barking out orders through the day,
my own in concern for their safety. Thankfully no one got hurt.




Once most of the dirt was cleared away, when the grate of rebar, that forms the floor of the septic tank, had to be lifted to the side. After that, the rest of the dirt was removed and the grate dropped down once again to the floor level.


Then the cement truck came and filled the floor



Meanwhile...the construction company was doing their fair share of the work


The ceiling of the basement is prepped for the cement to be poured.


Truck #1 unloads


Truck #2 unloads


Cement Mix-Truck #3 was needed for completion of this ceiling & the floor of the tank.

Monday, May 16, 2016

May 15th

Sunday
church - orphanage - downtown


The church in Darivka
Each team member introduced themselves - Bryan shared he'd given every part of his life, with his wife to do whatever God asked, so he showed up at NMSI 6 months ago and then here.




Dale preached - giving Sasha a bit of a break


Sasha and Nadya shared in song with us all
Jesus is our first love


poetry


& one of the 2 grand children present shared a song with us all


We delivered bananas that were purchased by a ladies class at 
The Lakeway Church in Lakeway, TX
The kids were so excited to receive them and the guys grateful to share with the kids.


These kids are temporarily relocated as their hall is being refurbished, makes living quarters a bit tight.


Sasha with Anya, we interrupted their nap time, but I don't think anyone minded.

Saturday, May 14, 2016

May 14th
All in a days work!


father, son team
Dale and Tyler working on making rebar frames for the back wall foundation


completed frame and one in place in the corner


back property line in-prep for the cement to be poured

basement ceiling prepped 
for the cement to be pour this next week




this hole's wall collapsed because of the amount of rain that's been falling
prayer for safety please, in the fixing process, as others could collapse too

Friday, May 13, 2016

Friday the 13th
O what a great day we had at the work site for Stephen's home!

The ceiling of the basement was the big project for the hired company today. It's quite the process to watch it being formed, here's a few of just the starting process.




I'll have more pics tomorrow so you can see the progress of this is process.


A lot of digging got done today. As I've said, it's rained every day and it's not a light shower, it's been a steady rain for at least an hour or two if not more each day. 
Today, gratefully, it didn't start until about 4 in the afternoon, but the heavy, almost mud like, dirt that has to be moved is no easy task. We're only getting started, but the trench for the fence wall is making visible progress.


Finishing up the metal working for the base-flooring of the septic tank. The truck to pour the concrete will come Monday, if the rain holds off, so it can get onto the site.
It's just a tad bit muddy.

Thursday, May 12, 2016

May 12th


this will be the support structure inside the base of the septic tank


see those sparks flying, that means hard work is gettin' done


placement for the grapevine trellis is laid out


prep workers for those in the pit
Paul and Sergey are cutting support blocks to go between the metal reinforcements


after a morning of working out in the orphanage,
working in the garden, the ground will be levelled and protective barriers for the base of the trees will help keep them from getting burried.

MAY 11th
Another day of work in the morning, rain in the afternoon


This is called the "canolizatsia" hole OR
the sewage tank pit that is just underway


brothers working together
Ralph and Bruce Wilson


getting the gravel into the pit


mud is not an issue, it is everywhere


packing down the gravel for the base under the tank floor that will be pour on day when it stops raining


enjoying the hard work, the work out, maybe just having fun


The prep workers for those in the pit


Naomi's plot, but it's changed!


The roof was removed off the old house that sits in a small corner of the plot, a start to getting that property prepared for building on & not for public use as a pathway to other places in town.


walking back to Stephen's home in Darivka




the hole for the foundation of the back wall on the garden plot


Bryan and Dale hard at work