Okay, so there's some progress that's starting on the roofing, especially since much preparation had to go up before today. 
Why today, Wednesday, October 26th
Well it's not a big holiday, just the rest of our lumber from Kiev arrived with the carpenter and his team today and the interior finished pieces that will bear the load of the roof. 
Excited, a little bit!


unloading of the truck


These are the eight columns with the premade trusses on the right.
All the wood in this photo has been finished with a light gray, natural look to match the colors that will coordinate in this main hall and the kitchen, an open area to one another.


Looking into the house at the side door, through the utility room
 and hallway into the main hall at the premade trusses.


Up on the ROOF TOP

In the GARDEN
The guys that were there to help today worked hard, but there was a challenging couple bumps in the day, to say the least.


 Maxim working on getting the ground prepared for an apricot tree and Sergei finishing the wall around the garden plot before winter sets in.


Because the decorative metal work going along the back of the fence is not ready yet, we put up a temporary simple metal cover for the open space through the winter at our neighbor ladies request. She wants people to stay off her property, so we met her request.


This is how it looked when finished


It's just we put it on the wrong side of the brick wall that's up, and the neighbor watched the whole production and came to tell us as the last screws were being placed in loose spots that she wanted it on our side of the fence, not taking 10 cm from her side of the fence. So after a day of work and lots of complaint from the neighbor, as she will use those 10 cm through the winter, the guys began to take everything apart and begin again. 
Tomorrow I'll share with you the end results.

Wednesday, October 19, 2016

October 19th
Updates on the roof, well trusses for the roof






I think I got all the perspectives except the one from up on top, 
not fond of homemade ladders and heights.

Went tree hunting today, now is the time to transplant them.
If the home is going to be lived in, it needs to have some provision of shade and fruit.
We lost three of the trees through this last year, the summer was especially harsh and dry. Those we do have are doing very well.

We looked at a nursery across the river from Darivka, outside the town called Ingoo. 
There is already a town called Ingoolets on the river Ingoolest, so this one just took the shortened version.


This dirt road took us to a barred dirt path, we walked the rest of the way. 
rather determined, or is "ruther" appropriate here?


Looking across at Darivka

It was so nice to see some trees I recognized.
The maples here were diseased, but the oaks were really pretty.




Japanese plum, a youngin'


Our tour guide with my 2 project managers.


The three water towers are always a delight to my heart. They sit on the plot right next to where we will build Naomi's home for the young ladies.
So it's been a while since I've posted anything. Part of the challenge with building projects is that when builders deviate from the building plan it takes a while to get back on track, fix problems that have been created. Yes, it's taken us a full three weeks to fix the problem and get the supplies needed to begin building again. Grateful we are building again, but we're about a month and half behind schedule at this point. 
God has a plan, trusting.

October 17th, Monday morning




From the day: Project 1
Getting the water off and out of the first floor house parents quarters
As there is no roof yet, with the rain we've had, it's been a challenge to keep this area fairly dry, the basement under it too.



From the day: Project 2
Getting the the current trees in the garden prepared for winter, it's cold already.
A new adventure on this sunny day.

Yes, that's fresh from the local gal with 2 cows. 
Gifted her a bit more than a dollar for this fine donation. 
We sorted through the fresh and older dried pieces, set the fresh aside to dry for next spring.



Did I do okay Pop?


Very inexperienced here, so heavily dependant upon the advice of others, we got lots, 
often conflicting, so we did our best.

Thursday, September 15, 2016

From this past week of visits to the worksite

looking at the main central room of the house

the front kitchen wall almost complete

going up

front of the houseparents quarters

looking into the house, across the main hall to the enclosed utility room and kitchen


looking from the kitchen into the entry way


Sasha discussing details with our carpenter from Kiev, Alexe

Tuesday, September 6, 2016

September 4th

getting the therapy garden ready for pouring a sidewalk
this required moving the gravel to the sidewalk from where the truck dumped it
we won't pour until spring, the ground is still shifting after refilling, 
the last big rain revealed this fact


this is about an eighth or less than what the pile looked like at the started of the day, 
it was a full truck load

we were all tired by the time 15:00 rolled around, especially because of the heat
----------------------------
and the roof begins
bedrooms all along the back wall of the house on the right

the back hall to the guest room and exercise room

the back door out to the therapy garden
bedrooms on the left, utility room on the right

Friday, August 26, 2016

August 26

Our back fence wall is beginning to take shape.
It stands behind this wall, pictured below.



My tireless project manager...


helping us to diminish this wood pile...
NOTE: This mess no longer exists, it has been removed of all metal pieces and sits in a corner of the garden nicely stacked.


as we build framework the for the sidewalk in the therapy garden.
Hopefully the sidewalk will be poured next Saturday, as long as we have no rain, and we have the crew we need to unload a truckful of cement.


This is about as much as I get in pictures these days, always behind the camera. 
My bucket of used screws and nails retrieved from the wood in the pile,
recycling what we can.
Today I got to use my power drill/screw driver again, it'd been out of commission for quite some time as the "starter box" (maybe) had to be shipped from Germany.
And I used the circular saw, chopped some wood on my own - happy!
August 23rd
Oksana and I shared a bit of time watering the fruit trees,
it's been very hot!