Friday, August 26, 2016

August 19th
UP! UP! UP!

Please be in prayer for this worker, Colya. 
He's just had back surgery as a hopeful answer to the back pain he's had. Out of the hospital, but still has time he needs to recover and that's without work compensation to provide for he and his families needs - workman's comp is not a Ukrainian thing.
We have helped to cover some of the costs for him. Colya fills the role right under the acting foreman, so his experience is needed. Our foreman, Constantine is also suffering from back pain, so you can pray for him as well.


This is the main hall of the house (above)
I am standing where the fireplace will be built


On the right will be the doorway into the main hall from the large entry way.

Thursday, August 11, 2016

August 10th

The cement has been poured in the widow headers and insulation
around the upper portion installed.


up close look at a header, this ones a doorway



standing inside the main hall at Stephen's house, 
looking out to the courtyard garden doors that go into the back hall, which then enter into the guest back bedroom and out the window on the far side of the house
an interesting perspective



the Ingoulets River, just outside of town

Friday, August 5, 2016

Pictures from Thursday, 
August 4th

Stephen's house
walls going up, window's being framed


we have progress, 
not quite as exciting as "we have lift off" sounds




Valodya and I were working more to even out the therapy garden plot.
The area we'll put in side walks will be close to level for those in wheelchairs.


Sasha and Vladamir worked to get the rest of the water out of the basement.
First the pump had to be fixed to pump out the water.
Thanks guys!

Wednesday, August 3, 2016

August 1st

Everything is happening more quickly now that the foundation 
has been inspected and approved.






Sunday, July 31, 2016

These pictures were taken on 
July 20th




The back wall of the house running parallel with our back property line 
where were putting up a security/privacy fence.
Unfortunately, our back neighbour has been everything, but kind.



Monday, July 11, 2016

July 11th 
Want to introduce you to our new security staff member

His names "little potato"

The walls are going up folks! 
I think these pictures portray much more than words can express.

This is the back wall of the house with it's 4 layers of brick around the perimeter.


this perspective gives insight -
were getting up off ground level


looking from the church back to the worksite


two men from church working on the back perimeter wall
Sergei, in the green is a professional brickmason.

Thursday, July 7, 2016

We've been in a holding pattern for some time now. 
The biggest cause of this is the poor quality strength of cement that was delivered by a cement company, poured to form the top layer of the foundation. 
In the pictures below, the pinkish-red foundation now, that's the chemical treatment applied to the cement. We've been waiting to see how well the chemical worked to improve the strength. It's been weeks now to go through this whole process. I'd ask for your prayer as we've lost one of our 4 hired workers in the process. The men working are hard workers, 
I hope we do not loose more.

We did just sign the paperwork and made the first payment to continue working with this company for the next phase, building the walls. Everyone is ready to begin, again we just need confirmation that the foundation is strong enough.


Preparing for the reinforced concrete beam to be poured underneath the basement ceiling in order to finish off and connect the top portion of the load bearing wall


Area left open for building the staircase to the basement.


Basement ceiling after reinforcements have been applied, waiting to dry out completely


The pink stripe is the foundation with reinforced chemicals applied.
The next step will be to use a press to make sure the dirt is pressed down and compact for when the floor will be laid.